PROJECTS
No Jobs Employer Scope of Work Periode
11 Feasibility Study - PLTM Simpang Aur 1 Wiratman

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, elektromechanical, instrumentation and control systems as well as transmission, and perform methods of construction.

June 2011 - October 2011
12 Construction Drawing - PLTM Cikopo 2 Arkora Hydro

Perform drawing of construction design.

August 2011 - December 2011
13 Feasibility Study - PLTM Simpang Aur 2 Wiratman

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, elektromechanical, instrumentation and control systems as well as transmission, and perform methods of construction.

October 2011 - February 2012
14 Basic Design & Detail Design - PLTM Tomasa Arkora Sulawesi Selatan

Perform site survey, topographic and hidrometri survey, geotechnical survey, hydrology analysis, hydraulics basic design, plan design calculations, design drawings and reports, making the implementation work plan schedule, basic design and detailed design

January 2012 - June 2012
15 Feasibility Study - PLTM Raisan Energi Alam Abadi

Review of optimum capacity of the mini hydro power plant and the availability of discharge data analysis, perform of optimum layout, basic design for civil work, metal, elektromechanical, instrumentation and control systems as well as transmission, and topographic and hidrometri survey, geotechnical survey, methods and schedule of construction, cost estimates, study financial analysis, provide feedback about the location of the field investigation, FS report, basic design drawings and budget plan.

April 2012 - August 2012
16 Basic Design & Detail Design - PLTM Tomoni Arkora Hydro

Perform site survey, topographic and hidrometri survey, geotechnical survey, hydrology analysis, hydraulics basic design, plan design calculations, design drawings and reports, making the implementation work plan schedule, basic design and detailed design.

May 2012 - September 2012
17 Feasibility Study - PLTM Siboruan 1 Cahaya Bintang Energi Nusantara

Review of optimum capacity of the MHPP and the availability of discharge data analysis, perform of optimum layout, basic design for civil work, metal, elektromechanical, instrumentation and control systems as well as transmission, and topographic survey, geotechnical survey, methods and schedule of construction, cost estimates, study financial analysis.


October 2012 - February 2013
18 Feasibility Study - PLTM Siboruan 2 Cahaya Bintang Energi Nusantara

Review of optimum capacity of the MHPP and the availability of discharge data analysis, perform of optimum layout, basic design for civil work, metal, elektromechanical, instrumentation and control systems as well as transmission, and topographic survey, geotechnical survey, methods and schedule of construction, cost estimates, study financial analysis.

October 2012 - March 2013
19 Basic Design & Detail Design - PLTM Olooloho Arkora Hydro

Perform field survey,  electrical survey, hydrology analysis, hydraulic analysis, design calculations plan, design drawings and design report, work plan schedule, basic design and detailed design.

March 2013 - July 2013
20 Basic Design & Detail Design - PLTM Yaentu Arkora Hydro Sulawesi

Perform field survey, electrical survey, hydrology analysis, hydraulic analysis, design calculations plan, design drawings and design report, work plan schedule, basic design and detailed design.

October 2013 - March 2014