PROJECTS
No Jobs Employer Scope of Work Periode
1 Ambal MHPP Feasibility Study Review Sumber Sejahtera Primadaya

Review Feasibility study report from the client in terms of hydrology, hydraulic dimension, structural stability, power production, energy production, constructability and economic feasibility of the project

October 2015 - November 2015
2 Tukad Balian MHPP Detailed Engineering Design Bali Energy Indonesia

Perform site survey, topographic and hidrometri survey, geotechnical survey, hydrology analysis, hydraulics basic design, plan design calculations, design drawings and reports, making the implementation work plan schedule, basic design and detailed design

February 2015 - December 2015
3 Nosu MHPP Basic Design and Feasibility Study Nosu Hydro

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, electromechanical, construction.

November 2014 - July 2015
4 Turi MHPP Basic Design and Feasibility Study Energy Alam Persada

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, electromechanical, construction.

March 2014 - July 2014
5 Mrican Basic Design and Feasibility Study Energy Alam Persada

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, electromechanical, construction.

March 2014 - July 2014
6 Mlirip MHPP Basic Design and Feasibility Study Energy Alam Persada

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, electromechanical, construction.

March 2014 - July 2014
7 Menturus MHPP Basic Design and Feasibility Study Energy Alam Persada

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, electromechanical, construction.

March 2014 - July 2014
8 Jatimlerek MHPP Basic Design and Feasibility Study Energy Alam Persada

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, electromechanical, construction.

March 2015 - July 2014
9 Pilubang MHPP Basic Design and Feasibility Study Inta Resources

Review of optimum capacity of the mini hydro power plant, review the availability of discharge data analysis, preparation of optimum layout, prepare basic design for civil work, metal, electromechanical, construction.

February 2014 - September 2014
10 Detail Design Project Extention - PLTA Tes 1x4.4 MW Amarta Karya

All the design work, exclude mechanical and electrical work. Make an inquiry procedure and reports procedure, perform design calculations, detailed plans, design drawings and design reports, and making the plan work schedules. Coordinate with First Party and Partner JO (PLN). Provide technical advice to the First Party.

March 2011 - July 2011